Chapter 270 : Raf (1/2)
t
A few minutes before the meal, they all ca a pontoon or painting a raft, swaying in a rain curtain, is naturally the best choice
There are many such boats in the lotus pool opposite the pro proposed to pack a boat and play with it
Both Liang Wenqing and Doudou juht in the water
Ye Qing also went up and tried it, so that the boat could be drawn straight, but it was not a turn
Next to it is carved wooden stirrups y and powered by electric propellers, whichthe deposit and taking aturned the rudder and headed for the direction of Jinxi Ancient Town
Sitting on the side of the bag, reaching into the rain curtain outside the painting, the little face is full of happiness and joy
On both sides of the river is the repairing shore of the blue-gray rock
Froe crosses both sides of the river
“Ye Zong, I have studied the 3D drawings of the building you provided”
A professional dress Liang Wenjing sat in the bow, soh our construction co qualification, it can take over the tallest building, only 43 floors of high-rise residential buildings”
“Building a ninety-nine-story building, I can guarantee the construction in strict accordance with the construction drawings to ensure the quality It is only the construction period, and I am afraid that our manpoill delay the construction period due to equipiant pile foundations you requested require a large-scale rotary excavator specially made in Geryun Port…”
”The rest of the ordinary pile foundation, we can find equip is ready to talk, and a group of gangs who are playing ater ran over, grabbed Ye Qing’s ar to talk about things, I'll drive a boat”
The boat speed is very slow, and the shi+p's side is also covered with very safe cushi+on rubber
Ye Qing gave up the position and told Liang Wenjing:
”All pile foundations will be taken care of by us You will be responsible for recruiting workers before the construction drawings come out”
”That……”
”Then there is no proble rubbed the corner of her dress and said solereater than the surprise
“Do you have the technology to build a skyscraper?”
“Of course, yes!”
Huaxia has the largest skyscraper in the world, but any building in the construction of Monster Heavy Factory will encounter a variety of technical problems which have never been seen before
These technical problems are al Wenjing heard the yun International Port, when building the 88 floors Tianfeng Building
The building was designed to dig up a 20-an to excavate 600 piles with a rotary digging machine
As a result, when the 530th pile was hit, there was a big accident
Because of the two days of heavy rain, the bottom of the foundation pit becaroundwater becaroundwater rushed out to the surface
As the groundwater gets bigger and bigger, the foundation pit becomes a vast ocean
Hundreds of pile foundations underneath in the water, together with the reinforced slope around the entire pit, are at risk of collapse
If it weren’t for the workers to stop, the boss of the construction company that was responsible for the construction at that tie into the ocean
In the end, Huaxia Erjian, a high-speed railway in China, was built A chief engineer with the title of acade took the equipment and took over the command to save the field
He coroundwater breaching point, pu material that was prepared from the chemical plant
The cranes were on the sides of the foundation pit and were in the group to the rain-shi+eld over the foundation pit
Greenhouse membranes with leaky pipes reduce rainfall, and borrowed pumps are everywhere on the side of the foundation pit
Finally, the groundwater breach was blocked and the water in the pit was pumped to the botto the trousers of the acade in the round, and the most difficult foundation will be the responsibility of the Monster Heavy Factory