Chapter 78 (1/2)

After Wang Bin's transformation, the production line was finally transformed. At the same time, the relevant production processes and workflow were also completed under Wang Bin's preparation. The production line finally turned on the power under the eyes of Wang Bin and others, and the workers on the production line began to get busy.

It seems that the production process of large-scale production line is extremely cumbersome, but in fact, it is much simpler than that of small-scale production line. Many processes have been completed by machines themselves. Manual operation only needs to operate various buttons on the equipment. Unlike small-scale production line, many people have to complete them in person.

For example, raw materials and additives can only be added manually at the original time, so the quality of the produced glass is not very stable, and even the whole furnace may be scrapped, but the addition of machines is different.

Although the production line also needs workers to press the Add button, the machine has been set in terms of the add time and amount. When raw materials are added, the machine will give an alarm to remind workers that raw materials need to be added.

Therefore, in theory, the quality of the glass produced by the large-scale production line will be more stable and the scrap rate will be lower. Of course, this is only in theory. The specific operation depends on the operation of the workers.

At the same time, when Wang Bin's large glass production line of Tiangong technology was finally transformed and started to run, Xiang Shixiong of Xifei also called Wang Bin and told him that Tiangong technology wanted ultra-high precision CNC machine tools, which had been approved. Someone would send them to Tiangong technology in the next two days for Wang bin to receive.

According to Xiang Shixiong, the number of high-precision machines they obtained this time is about 10, of which the highest precision is 0.01 micron and the lowest precision is 0.1 micron.

However, there is only one 0.01 micron machine tool, three 0.05 micron machine tools, and the others are 0.1 micron.

At the same time, the sizes of these machine tools are also different. Among them, the high-precision machine with an accuracy of 0.01 micron is the largest. The length of the worktable alone is more than three meters, the width is about two meters, and the weight is as high as nearly 100 tons.

The other three 0.05mm precision high-precision machines are much smaller, and their size is almost the same as that of ordinary machine tools.

As for those 0.1 micron machine tools, there are all sizes and models, of which the smallest and largest machining size is about 800 mm.

Of course, Xiang Shixiong of Xifei knows that their Tiangong technology machine tools are mainly used to process special glass, so Xiang Shixiong of Xifei explained when he helped them apply for Tiangong technology that the machine tools are used to process special glass, so there are not only ordinary tungsten steel tools, but also professional diamond tools in the tool side.

Wang Bin and Tiangong technology pay a lot for these ten high-precision machines. The price of these ten machine tools alone is as high as nearly one billion. Most of the money is spent on that 0.001 micron machine tool!

With the completion of large production lines and the arrival of high-precision machines, Wang Bin and their Tiangong technology also began to produce the orders they ordered for Xifei and Jiangfei.

Since there are not many skilled workers for glass production, those new workers must be trained before taking up their posts. At the same time, in terms of machine tool operators, these machine tools can not be carried out by ordinary machine tool operators, but must be completed by professional high-precision machine operators. Fortunately, Wang Bin has also recruited several workers during this period, At the same time, Professor Hu also helped Wang Bin find some through his own relationship.

Otherwise, even if Wang Bin has a high-precision machine in his hand, he can't process qualified products.

”President Wang! Chief engineer Lin of 969 group called and said that the high-precision bearing production line he helped us apply for has also been approved. It will come in these two days, but it is not the medium and large bearing production line we expect, but a small automatic high-precision bearing production line.” Wang Xu said to Wang Bin in Wang Bin's office!