Chapter 247 (1/2)

With Wang Bin's inspection of these engines that have been tested for nearly 8000 hours, he is still very satisfied with the test performance of this engine. Of course, if the performance of the bearings is better, it will be more perfect.

At the same time, after the commissioning of these ten engines, the laboratory is also ready to start the commissioning of new engines. Because through the efforts of Tiangong technology over this period of time, the second aeroengine and the third engine, that is, the turbofan engine and electric helicopter engine of large bypass ratio, have been designed and mapped, It is ready for trial production.

Of course, compared with the second engine, that is, the turbofan engine with large bypass ratio, the third engine, that is, the engine of electric helicopter, costs much less in R & D, testing and testing.

At the same time, on the test platform, the electric engine no longer needs the same test platform as the fuel engine. After all, the two use different energy and internal structure, and naturally need different platforms.

Therefore, the No. 2 engine, that is, the turbofan engine with large bypass ratio, will be tested in this test workshop.

After Wang Bin and Professor Cha completed the full life test of YG001 engine, they immediately arranged the trial production of large bypass ratio turbofan engine and electric helicopter. Wang Bin went out of the laboratory and returned to his office.

At the same time, at this time, the second batch of tg001 engines of Tiangong technology have been manufactured and sent to the aircraft manufacturing plant, that is, the production plant of No. 10 and No. 16 fighters.

However, Wang Bin has purchased a large number of high-end equipment from the technology mall and reality during this period, so the number of engines manufactured this month is not the same as Wang Bin said before, but as many as 16, which is six miles more than Wang Bin said before.

Of course, with the delivery of the second wholesale motive, both the No. 10 fighter factory and the No. 16 fighter factory suddenly began to be busy.

However, compared with the factory of fighter 10, the factory of fighter 16 is even more so. After all, fighter 10 does not need to make too many modifications to install this engine. Even if the electronic equipment and batteries used on fighter 10 are replaced, it does not need to make too many modifications to fighter 10, So at this time, the No. 10 fighter factory has begun to produce a new No. 10 fighter using this engine.

The No. 16 fighter is different, although as early as last month, the No. 16 fighter factory had finalized a new model scheme using tg001 engine.

But so far, the new 16 has not been manufactured, but fortunately, the preparations have been basically completed, and the new 16 fighter has also begun to be manufactured.

Of course, as the new No. 16 fighter began to be manufactured, the air force also attached great importance to this matter. Even from time to time, senior generals of the air force came to check the progress and accuracy of this aircraft.

In this regard, the manufacturer of the No. 16 fighter did not dare to slack off at all, and took out 12 minutes of the factory's energy to manufacture this new No. 16 fighter.

Of the course, as new No. 16 fighter began to be manufactured, of theficials did not hide this, but reported relevant contents on major official media from time to time.

As for the Internet, the news of this new No. 16 fighter is everywhere.