Chapter 467 (2/2)
Even the R & D and production areas of rocket engines, pulse detonation engines and ion engines are also in this area, so the phase I project is actually very large.
At the same time, compared with the old industrial zone, each plant in the industrial zone here has a very large atmosphere. At the same time, these plants are much better than those in the old industrial zone in terms of height and area,
Of course, in the phase I project, in addition to various R & D and production plants, other facilities here are very complete, such as various green belts, transportation, raw material reserves, parts warehouse, finished product warehouse, rocket segmented warehouse, rocket overall warehouse, etc.
It can be said that only the first phase of the project looks very shocking.
In addition, there is a road with a width of more than 100 meters leading to the distance. This road is the take-off and landing runway of aerospace aircraft here in the great desert Industrial Park. According to the plan, this runway will be up to 20 or 30 kilometers long in the future.
At the same time, this runway is only a special runway for Tiangong technology. According to the plan, there will be at least ten runways in the whole Aerospace Center in the future.
For the first phase project of the whole great desert Industrial Park, all roads are well planned, and even the greening is not worse than that of the coast. After all, with the continuous greening project of the great desert, the whole great desert, especially the industrial park, has changed from a yellow sand to a green Ocean.
Each test run workshop in the industrial zone. The intelligence level of its production line is even higher than that of the old industrial zone of Tiangong technology.
After all, in the industrial park on the side of the desert, Wang Bin has also built a supercomputer in the past month. Due to the internal chips, all the supercomputers are developed by Tiangong technology, coupled with the optimization of computer framework.
Therefore, the computing power of this computer is at least ten times that of the old industrial zone. In addition, the more advanced intelligent system obtained from Lao Huang makes the computing power of this computer at least 100 times that of the old industrial zone.
In other words, the supercomputer in this industrial zone has the strongest computing power in the world, but it is unknown because Tiangong technology has not announced this supercomputer.
At the same time, in the whole industrial zone, in addition to these production equipment, the central air conditioning, computers in various laboratories, and even all gates in the whole industrial zone are controlled by this computer.
Of course, in other aspects, such as the treatment of noise, waste water and waste gas in the workshop, and the equipment used in the industrial zone are also very advanced, basically implementing zero emission.
Of course, Tiangong technology has paid such a huge price. The capacity of this industrial zone, even if it is only a phase I project, is amazing.
Not to mention anything else, just in rocket engine manufacturing.
Take the 1000 ton rocket engine for example. If it is such a huge rocket engine in the old factory, it will take at least a month to produce one.
However, in the heavy-duty rocket engine production plant on the side of the desert, it only takes five days to produce an engine, and this is not the highest output. If the production capacity is liberalized and 24-hour uninterrupted production is carried out, there is absolutely no problem with one in three days.